|

Electric Arc Furnace Project by Algoma Steel: EllisDon Appointed as Construction Manager

March 27, 2023

Algoma Steel Group Inc. recently announced the appointment of EllisDon as Construction Manager for completion of its transformative Electric Arc Furnace (EAF) project. EllisDon brings over 70 years of industrial and civil construction management expertise and experience to the project bolstering Algoma’s internal project team as Algoma’s EAF facility continues to progress.

Quotes from the CEO’s About the Project

Ellisdon PM Electric Arc Furnace construction

“We are very proud to join Algoma’s team in one of Canada’s largest electrification projects targeting reduced carbon emissions. We are excited to bring our broad experience, a spirit of profound openness and a determination to help Algoma achieve all of its objectives. This is a partnership with Algoma, and a partnership with the environment, and we are very excited to be a part of it,”

Geoff Smith, President and Chief Executive Officer, EllisDon
Ellisdon PM Electric Arc Furnace construction for Algoma Steel

Michael Garcia, Algoma’s CEO said, “Our transformative Electric Arc Furnace project continues to advance on time and on budget, and as we enter the more complex phases of construction, we are pleased to partner with EllisDon to manage our project with optimal functionality and effectiveness. We continue to expect a successful EAF start-up in mid-2024. Once the project is completed, we expect Algoma will be one of the lowest-cost green-steel production facilities in North America, expanding our annual steelmaking capacity from 2.8 million tons to 3.7 million tons with a significant reduction (estimated at approximately 70%) in carbon emissions. We are proud to be a first-mover in the complete electrification of an integrated steelmaker.”

Michael Garcia, CEO Algoma Steel

Source

Related Story

Algoma Steel Installs First Structural Columns for Electric Arc Steel Shop

Algoma Steel Group Inc. has announced that the Company installed the first structural steel columns this week at its electric arc steelmaking facility (‘EAF’) in Sault Ste. Marie, Ontario Canada and Ontario Premier Doug Ford visited the site to commemorate the project milestone.

Related Articles


Latest Articles

  • The Future of Safety Networks

    October 8, 2025 How scalable safety systems are reshaping industrial automation As factories become more connected and fast-changing, traditional safety systems often fall short. Scalable safety networks offer a flexible, modular solution that helps manufacturers stay ahead on safety, compliance, and productivity. Designed for Agility Scalable safety networks are built on a modular foundation. This… Read More…

  • ABB Contactor Selection Guide Canada

    October 1, 2025 ABB contactors are among the most reliable electrical switching devices in industrial automation. As Canada’s leading ABB authorized distributor, Proax has helped thousands of engineers and technicians select the right ABB contactor for their applications. Whether you’re designing a new motor control panel or replacing existing equipment, choosing the right ABB contactor can… Read More…


Featured Article

Revolutionizing Material Movement with Autonomous Mobile Robots

Revolutionizing Material Movement with Autonomous Mobile Robots

In today’s fast-paced manufacturing and logistics industries, the need for efficient and flexible material movement solutions has never been greater. Traditional methods like conveyor systems, forklifts, and manual pushcarts have served us well, but they come with limitations.

That’s why Omron is thrilled to announce the launch of their game-changing MD Series of Autonomous Mobile Robots (AMRs). Read more


Products

  • Schneider Electric Unveils New AI Data Centre Reference Designs with NVIDIA

    October 6, 2025 Schneider Electric, a leader in the digital transformation of energy management and automation, has announced new reference designs developed with NVIDIA that significantly accelerate time to deployment and aid operators as they adopt AI-ready infrastructure solutions. The first reference design delivers the industry’s first and only critical framework for integrated power management and liquid… Read More…

  • PISA-M Electronic Circuit Breakers: New NEC Class 2 Compliant Variants Available

    October 6, 2025 PULS introduces new 4-channel electronic circuit breakers designed specifically for power distribution in NEC Class 2 circuits, expanding the existing PISA-M series. PISA-M enables the safe distribution of load current into four individual Class 2 circuits. This offers a cost-effective alternative to multiple individually approved NEC Class 2 compliant power supplies, reducing both acquisition costs and… Read More…