|

MDA Awarded $269m Contract for Next Phase of The Canadarm3 Program

MC MDA Awarded 269M Contract for Next Phase of Canadarm3 1 400

March 10, 2022

 

MDA Ltd., a leading provider of advanced technology and services to the rapidly expanding global space industry, recently announced that it is receiving $269M from the Canadian Space Agency (CSA) for the next phase of the Canadarm3 program. The recent award for Phase B of the program will see MDA complete the preliminary design of the Canadarm3 robotics system that will be used aboard the NASA-led Gateway – a major, multi-year international collaboration to establish a sustainable space station in lunar orbit to support human and robotic missions to the surface of the Moon.

This builds upon MDA’s completed Phase 0 and subsequent Phase A, which established the technical requirements needed for the design and manufacturing of the Canadarm3 Artificial Intelligence (AI)-based robotic system. Operating approximately 400,000 kilometres from Earth, Canadarm3 will be a highly innovative autonomous system capable of maintaining itself and making decisions with minimal human intervention.

 

MC Ontario Government Invests in Cutting Eddge Space Robotics MDA 5 400

“This is another important milestone for MDA that demonstrates our ability to execute in the rapidly accelerating global space economy and further reinforces our role as a worldwide leader in robotics and space operations,” said Mike Greenley, Chief Executive Officer of MDA. “MDA now intends to leverage its world-class engineering capabilities, mission expertise, and cutting-edge Canadarm3 technology with an eye towards commercializing space robotics products in the years ahead.”

 

MC MDA Awarded 269M Contract for Next Phase of Canadarm3 13400

 “Driven by Canada’s strategic investments in space robotics, Canadarm3 will fuel incredible opportunities for our space sector,” said CSA President Lisa Campbell. “Within a growing global space economy, MDA will work with Canadian companies from coast to coast, strengthening a robust industrial supply chain primed for leadership and success as humanity returns to the Moon and ventures farther than ever before.”

 

MC Ontario Government Invests in Cutting Eddge Space Robotics MDA 7 400

 

The contract will be added to MDA’s backlog in the first quarter of fiscal 2022, with the design work expected to be completed over the next 17 months.

MC MDA Awarded 269M Contract for Next Phase of Canadarm3 1 400

 

 

 

Source

 

 

Related Articles


Latest Articles

  • The Future of Safety Networks

    October 8, 2025 How scalable safety systems are reshaping industrial automation As factories become more connected and fast-changing, traditional safety systems often fall short. Scalable safety networks offer a flexible, modular solution that helps manufacturers stay ahead on safety, compliance, and productivity. Designed for Agility Scalable safety networks are built on a modular foundation. This… Read More…

  • ABB Contactor Selection Guide Canada

    October 1, 2025 ABB contactors are among the most reliable electrical switching devices in industrial automation. As Canada’s leading ABB authorized distributor, Proax has helped thousands of engineers and technicians select the right ABB contactor for their applications. Whether you’re designing a new motor control panel or replacing existing equipment, choosing the right ABB contactor can… Read More…


Featured Article

Revolutionizing Material Movement with Autonomous Mobile Robots

Revolutionizing Material Movement with Autonomous Mobile Robots

In today’s fast-paced manufacturing and logistics industries, the need for efficient and flexible material movement solutions has never been greater. Traditional methods like conveyor systems, forklifts, and manual pushcarts have served us well, but they come with limitations.

That’s why Omron is thrilled to announce the launch of their game-changing MD Series of Autonomous Mobile Robots (AMRs). Read more


Products

  • Schneider Electric Unveils New AI Data Centre Reference Designs with NVIDIA

    October 6, 2025 Schneider Electric, a leader in the digital transformation of energy management and automation, has announced new reference designs developed with NVIDIA that significantly accelerate time to deployment and aid operators as they adopt AI-ready infrastructure solutions. The first reference design delivers the industry’s first and only critical framework for integrated power management and liquid… Read More…

  • PISA-M Electronic Circuit Breakers: New NEC Class 2 Compliant Variants Available

    October 6, 2025 PULS introduces new 4-channel electronic circuit breakers designed specifically for power distribution in NEC Class 2 circuits, expanding the existing PISA-M series. PISA-M enables the safe distribution of load current into four individual Class 2 circuits. This offers a cost-effective alternative to multiple individually approved NEC Class 2 compliant power supplies, reducing both acquisition costs and… Read More…