| | |

Ontario Streamlining Complex Approval Processes

March 6, 2024

Ontario Streamlining Complex Approval Processes

Changes will protect world-class environmental standards while helping get shovels in the ground sooner

As the Ontario government is investing nearly $98 billion over the next ten years to build new roads, highways and public transit, including Highway 413 and the Bradford Bypass, it is streamlining and simplifying the complex 50-year-old environmental assessment (EA) process to make it easier and faster to build the infrastructure needed to support the province’s growing population.

“As Ontario grows at record speed, it’s never been more important to build new roads, highways, public transit and homes, so we can get drivers out of bumper-to-bumper traffic and bring the dream of home ownership into reach for more people,” said Andrea Khanjin, Minister of the Environment, Conservation and Parks. “Our government is supporting municipal partners by streamlining and simplifying complex environmental assessment processes to get shovels in the ground and finish major projects faster. We’re doing so while protecting strong environmental oversight and ensuring meaningful consultations before projects can move forward.”

After several months of consultations, one of the changes to the EA process is moving to a project list approach, which will list the types of infrastructure projects that still require the highest level of environmental assessment such as large landfills and electricity generation facilities. The project list approach is a shift from the previous focus on project proponents to what the project is and its potential for environmental effects. Using a project list approach will bring Ontario in line with other similar jurisdictions, including the federal government, Quebec and British Columbia.

These changes, which come into effect on February 22, 2024, will help get highways, rail and electricity transmission lines built up to four years sooner by allowing them to follow a streamlined EA process that will save time and money while maintaining environmental safeguards. The projects that are being moved to streamlined processes continue to have requirements to identify and mitigate environmental impacts and for consultation, including Indigenous consultation, prior to implementation.

For example, the comprehensive EA process for the East-West Tie Transmission Project that runs from Wawa to Lakehead in Northern Ontario took more than five years to complete. With these changes, a similar project could follow a streamlined process and be completed within two years, while still undergoing a mandatory consultation process and continued strong environmental oversight. Some of the time savings are a result of the streamlined processes not requiring a Terms of Reference (up to two years) for the project as the streamlined process already sets out the requirements.

The Ontario government is also beginning consultation, including with municipal partners, on a new streamlined process for certain municipal water, shoreline and sewage system projects. This new process would help accelerate project planning by limiting the process to six months from 18 months or more. These time changes could be achieved by providing a regulated timeline, whereas under the current process there is no time limit.

An example of a municipal project that would be able to go through this proposed process is building a new large wastewater treatment plant. To build this, the municipal class EA process can take up to two years or more. The proposed process could see the EA process completed in as little as six months.

The government is also considering a minor change to the Environmental Assessment Act that would make it clearer for municipalities, provincial ministries and agencies that expropriation is one of the ways property can be acquired for a project before the EA process is completed.

This measure is part of the upcoming Get It Done Act, that will kick off the spring sitting of the legislature on February 20, 2024. The Act, if passed, would make it faster to build and easier to save money.

Quick Facts

  • The environmental assessment process provides important environmental oversight by assessing environmental impacts and showing how impacts can be avoided or reduced.
  • Streamlined environmental assessment processes already exist for projects like transit, which is being used successfully by Metrolinx to help get projects done faster.
  • Consultations were held in 2020, 2021 and 2023 on the planned changes to move Ontario’s environmental assessment program to a project list approach. The ministry sought feedback on what projects should be subject to a comprehensive environmental assessment, the highest level of assessment. The ministry then consulted on draft regulations setting out the projects proposed to be subject to a comprehensive EA and related actions required to move to a project list approach.

Quotes

“As Ontario’s population continues to grow, our government is ensuring we have the transportation network and infrastructure needed to build a better province for generations to come. By streamlining building approval processes, we can get shovels in the ground faster and deliver on our historic infrastructure investments to get cars and trains moving.”

– Prabmeet Sarkaria
Minister of Transportation

“Hydro One is building critical electricity infrastructure across the province to meet the growing electricity demand in Ontario and welcomes changes to Environmental Assessments that modernize and streamline the process. We take our responsibility and stewardship of our natural resources seriously and are committed to ensuring all of our infrastructure projects are built in an environmentally responsible manner, with local interests in mind.”

– Andrew Spencer
Executive Vice President, Capital Portfolio Delivery, Hydro One

“Modernizing Environmental Assessments for municipal infrastructure will help reduce the duplication of approvals necessary for the installation of low-risk infrastructure that is a required part of new housing developments. Streamlining this approvals process will save time and resources for individuals, businesses, and government agencies without compromising any environmental outcomes. By simplifying regulations and reducing administrative burdens, Ontario is making it easier for businesses to operate and invest in growth.”

– Steven Crombie
Director of Government Relations and Public Relations, Ontario Sewer and Watermain Construction Association

“Modernized environmental assessment processes are a critical enabler for housing, streamlining processes for municipalities to help them build infrastructure like roads, sewers, and water systems more quickly. The initiatives announced today take a risk-based approach to environmental management, removing red tape for straight-forward municipal infrastructure projects and focusing resources where they are needed most. AMO looks forward to continuing to work with the ministry on implementation details.”

– Colin Best
AMO President, Regional Councillor for Halton

Additional Resources

Learn how Ontario is modernizing its environmental assessment program

Read the proposal for environmental assessments municipal infrastructure projects

Source

Related Story

Ontario Supporting Plan to Refurbish Pickering Nuclear Generating Station

The Ontario government is supporting Ontario Power Generation’s (OPG) plan to proceed with the next steps toward refurbishing Pickering Nuclear Generating Station’s “B” units (units 5-8). Once refurbished, Pickering would produce a total of 2,000 megawatts (MW) of electricity, equivalent to powering two million homes, helping to meet increasing demand from electrification and fuelling the province’s economic growth.

Related Articles


Latest Articles

  • Improving Industrial Sensing: Omron’s Smart Fiber Sensor

    May 7, 2024 In today’s fast-paced industrial landscape, efficiency and reliability are paramount. Manufacturers are constantly seeking innovative solutions to optimize their processes and minimize downtime. Omron, a leader in industrial automation, has recently unveiled its latest Fiber Optic Amplifier which addresses critical market problems, and improves the way industrial sensing is approached. This blog… Read More…

  • Revolutionizing EV SMT Assembly: Enhancing Quality and Efficiency with Advanced CT X-Ray Inspection

    May 7, 2024 In the dynamic realm of electric vehicle (EV) manufacturing, ensuring the utmost quality and reliability of circuit boards is of paramount importance. Omron, a pioneering force in automaton technology, has developed the VT-X850, an innovative CT X_Ray inspection system tailored specifically for EV SMT (surface mount technology) assembly This state-of-the-art machine offers… Read More…


Featured Article

Revolutionizing Material Movement with Autonomous Mobile Robots

Revolutionizing Material Movement with Autonomous Mobile Robots

In today’s fast-paced manufacturing and logistics industries, the need for efficient and flexible material movement solutions has never been greater. Traditional methods like conveyor systems, forklifts, and manual pushcarts have served us well, but they come with limitations.

That’s why Omron is thrilled to announce the launch of their game-changing MD Series of Autonomous Mobile Robots (AMRs). Read more


Products